Almost…

The major projects are completed, and we are getting ready to untie the lines!

A high level summary of the projects that have been completed by the amazing team at Marine Craft, our home marina:

  • Upgraded the solar panels to 4 large panels for a total capacity of 1280 watts on the aft arch of the boat
  • Added a mount for Starlink, so we have internet on the boat even in remote locations
  • Upgraded the inside navigation station to have a full set of instruments so we can stand a watch from inside if needed
  • Removed the old name and logo from the boat, and added the new Tilia logo

Just a couple small projects left and we can start traveling. That doesn’t mean we are done with projects. It just means we’re done with enough projects to get going!


You can follow us on noforeignland.com, too!


Posted

by

Tags: